I have OG-100 and OG-300 certifications. Will I need separate inspections for each?
Generally, as long as the same Quality Management System is used for both the solar thermal collectors and the solar water heating system, inspection requirements for OG-100 and OG-300 can be satisfied with a single inspection event. Contact ICC-SRCC if you have multiple manufacturing locations to discuss your specific requirements.