The production line is not yet operating for the product I have certified. Do I still need to be inspected?
If the production line has not yet begun operation for a new product, an assigned inspection may be postponed at the discretion of ICC-SRCC. Listees in this situation should contact ICC-SRCC directly to determine the options available for their certification.