We do not have a traditional factory assembly line for the product we have certified with SRCC. Do we still need to undergo an inspection?

There are several cases where a listee may not have a traditional manufacturing line for a product they have listed with SRCC: Contract Manufacturer: If the product is manufactured entirely by another company, ICC-SRCC may need to inspect that supplier’s manufacturing facility. Or, if the product is first shipped to the listee where it is […]

Continue reading


What is the difference between a Qualifying and Surveillance Inspection?

Qualifying Inspections must be conducted for all production facilities and Quality Management Systems that have not been previously inspected by ICC-SRCC. The Qualifying Inspection seeks to capture baseline information on the facility and systems for use in subsequent inspections. A Qualifying Inspection may also be triggered if a production facility is moved or if it […]

Continue reading


Why does ICC-SRCC conduct inspections?

ICC-SRCC operates third-party certification programs accredited to ISO/IEC 17065. This means that it confirms that the product submitted for certification meets the requirements of the program at the time of application, and as long as the certification is continued. Periodic ICC-SRCC inspections confirm that quality processes are in place to produce compliant products in an […]

Continue reading